Saturday, April 9, 2011

Two Coats and a Loft

For the past few weeks we have had some seriously awful spring weather. For the last three days it has snowed every day. Today is snowed litterally all day long.

What I have been working on is getting the inside ceiling painted and building a loft for our youngest.
It is really just a bunk but in selling it to my daughter I sold it as a loft so it will now and forever be known as the loft.
What I did was use 1/8 inch 2X2 angle to build the frame then secured it with grade 8 bolts to the frame.

The frame turned out really great and I will use some 3/4 plywood to complete the loft, yes the loft.

1 comment: